Brand new remanufactured SW1500 waits on the Kia lead to go to work for GAPS, Inc, the contractor charged with rail operations along with its other final processing tasks.          
The loaded racks sitting in the rear left of the pictures are on the two storage tracks at Gabbetville. The train is ready for CSX to pick up and forward to distributors.
Date: 6/10/2009 Location: West Point, GA Views: 536 Collection Of:   Hank Stephens
Locomotives: LOSX 2587(SW1500)    Author:  Hank Stephens
Brand new remanufactured SW1500 waits on the Kia lead to go to work for GAPS, Inc, the contractor charged with rail operations along with its other final processing tasks.
Picture Categories: This picture is part of album:  Kia Motors Manufacturing Georgia (KMMG) comes to West Point, GA
Share
User Comments
Name Type Comments Date

Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=2226591