Traffic on the Plymouth Sub has increased substantially due to a boulder transload operation near Elkhart Lake. The boulders are being shipped to Texas to aid in the repair of seawalls damaged by Hurricane Ike in 2008. |
Date:
10/14/2010 |
Location:
Plymouth, WI Map  |
Views:
287 |
Collection Of:

Andre Wehrle |
Rolling Stock: |
Author: Andre Wehrle
|
 |
Picture Categories: RollingStock |
This picture is part of album: The WSOR Northern Division |