During recent crossing rehabilitation, all non-main tracks were cut, thus reducing the 5-track crossing to a 2-track crossing. |
Date:
7/21/2010 |
Location:
Bedell, ON CA |
Views:
186 |
Collection Of:
Russell Lees |
|
Author: Russell Lees
|
|
Picture Categories: Action |
This picture is part of album: CP Rail |