Approach #1  Contributor's Pick!       
Westbound signal, Track 1 displaying Aspect (Steady Yellow over Steady Red.) NORAC RULE 285- NAME APPROACH . INDICATION- Proceed prepared to stop at the next signal. Trains exceeding Medium Speed must begin reduction to Medium Speed as soon as the engine passes the Approach Signal.. West view of tracks 1, 2 (NS lehihg Line), behind the approach aspect is the Valley Interchange Track. To the left of Track 2 is the Port Reading Secondary
Date: 6/29/2022 Location: Bound Brook, NJ   Map Show Bound Brook on a rail map Views: 96 Collection Of:   Steve Coraggio
Author:  Steve Coraggio
Approach #1
Picture Categories: Scenic,Bridge,Signal,Track,Action This picture is part of album:  Westbound Signal-Approach on Track1 and NS Train 11N
Share
User Comments
Name Type Comments Date
Scott Crotwell General Fantastic starting shot ! 8/5/2022 7:58:44 PM
Tom Beckett General Great shot of signals and track arrangement. I remember when the Port Reading Secondary conncted to the Trenton Line, just to the west of the diamond with the Reading/CNJ connection. The Valley Interchange Track is the connection to the former CNJ, now the Raritan Line?? 8/6/2022 4:23:27 AM
Tim Darnell General Nice setup shot! 8/6/2022 7:16:56 AM
Steve Coraggio General Scott, thank you very much!!!!!!!!!!!!!!!!!!!!!!!!!!! 8/6/2022 3:33:23 PM
Steve Coraggio General Tom, thank you very much and yes the Valley Interchange Track still connects with the Raritan Valley Line at Bound Brook Station, east of the old CNJ station that is closest to the Lehigh Line 8/6/2022 4:34:00 PM
Steve Coraggio General Tim, Thank you very much!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! 8/6/2022 4:53:25 PM

Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=5813532