PW 4001 leads train CT-1 past a church steeple and some fall foliage. Here, the train will split up. PW 4001 will take PW 3005 and 3 box cars across the Connecticut River to Portland and Smurfit-Stone Container. The other part of the train, with PW 3911 and PW 3902 and a loaded flat car, will refuel those two units at the fueling pad. |